Construction Scheduler - Memphis
💰 $80,000 – $130,000/yrMarket estimate · not provided by the employer
At a glance
- Who can apply
- United States
- Work arrangement
- On-site · Southaven, MS; Memphis, TN
- Employment type
- Full-time
- Salary
- $80,000 – $130,000/yr · market estimate
- ✓ Open to early-career candidates
Checked against the employer's source on November 21, 2026. Details come from the employer's posting; confirm them on the application page.
Advertisement
Put your brand in front of 300,000+ monthly visitors worldwide
Job Description
SpaceXAI is a small, hands-on team building AI systems to understand the universe. This Construction Scheduler role builds, maintains and communicates construction schedules for the Memphis project, based in Southaven, MS or Memphis, TN.
- Build baseline CPM schedules from drawings, specs, estimates, bid packages and construction sequences, including WBS, coding, logic and calendars.
- Maintain the live schedule by collecting progress from superintendents, project managers and trades and updating percent complete, durations and logic.
- Publish weekly look-aheads and monthly official schedule updates on a set cadence.
- Own the critical path, track near-critical work, float erosion and out-of-sequence progress, and explain why end dates move.
- Produce three-week look-aheads that match the master schedule and realistic field crewing.
- Analyze schedule impact of RFIs, change orders, design late-outs, procurement, weather and labor shortages, and prepare time-impact and recovery analyses.
- Coordinate with project managers, superintendents, estimators, procurement, design, owners, CMs and subcontractors to reflect committed dates.
- Resource-load and where required cost-load the schedule, and flag crew stacking, craft shortages and unrealistic production rates.
- Prepare narratives, variance reports, S-curves, histograms and executive summaries for internal reviews and owner submittals.
- Support claims and delay documentation with contemporaneous records when needed.
- Enforce schedule standards for naming, coding, updates, backup and version control.
- Facilitate or support pull-planning and Last Planner sessions and convert commitments into CPM logic.
Summary of SpaceXAI's posting by JobsRemoteList. Read the full details and apply on the employer's site.
Requirements
- At least 4 years of construction scheduling on active projects with a GC, CM, owner or specialty contractor.
- At least 4 years using Smartsheet, MS Project or similar, including calendars, relationships, filters and schedule quality checks.
- At least 4 years of owner or CM specification-driven schedules such as DCMA 14-point, USACE or similar metrics.
- Preferred: bachelor's in construction management, civil engineering or related field, or equivalent field experience.
- Preferred: PSP (AACE), PMI-SP, PMP, CCM or similar credential.
- Preferred: forensic delay analysis, time-impact analysis and claims support experience.
- Preferred: cost or resource loading, earned value and cost system integration.
- Preferred: Last Planner or pull planning experience; BIM 4D (Navisworks, Synchro) is a plus.
- Preferred tools: Power BI, Smartsheet, Procore, Autodesk Construction Cloud.
- Must be willing to work extended hours, including the current 6-day, 12-hour construction cadence.
- Must be comfortable working in a fully onsite environment.
Advertisement
Put your brand in front of 300,000+ monthly visitors worldwide
Related Jobs
Find more than a single listing
Discover more jobs
Join now and find your dream job or a higher-paying opportunity with better employer visibility, stronger internal discovery and easier access to worldwide hiring signals.
Discover hidden jobs
Surface roles you may miss on noisier boards and move through cleaner employer links and better intent pages.
Head start against the competition
See fresh roles, related pages, salary context and company signals faster so you can apply earlier and better.
10,000+ more jobs than narrower job boards
Explore remote, hybrid and location-based opportunities across worldwide markets instead of relying on one narrow inventory.
Worldwide opportunity coverage
Use region pages, country-eligibility pages and skill pages built for global job seekers, not just one market.
Social proof
Trusted by professionals
“I found several relevant roles and the vacancy pages were easy to understand.”
Santiago Gómez
Marketing Specialist · 🇨🇴 Colombia
“The filters are clear, the listings are useful, and I saved a lot of search time.”
Putri Lestari
QA Engineer · 🇮🇩 Indonesia
“There are good vacancies, but availability varies depending on the region.”
Oliver Campbell
QA Engineer · 🇳🇿 New Zealand